Archive for June 2016

DRA to design processing facilities for Pilgangoora lithium project

JOHANNESBURG (miningweekly.com) – Perth-based lithium developer Altura Mining has tasked multidisciplinary global engineering group DRA with the preliminary engineering and design of its processing facilities at the Pilgangoora lithium project, in Western Australia’s Pilbara region. Pilgangoora was recognised as an advanced-stage, near-term lithium project. Mining would be conducted by openpit methods and a processing facility…

Read More

DRA Awarded Design of Pilgangoora Lithium Project by Altura Mining

DRA has been awarded the preliminary engineering and design of the processing facilities for the Pilgangoora Lithium Project, located in the Pilbara Region of Western Australia. The project is being developed by Altura Mining of Perth and is recognised as an advanced-stage, near-term lithium project in Australia.  Mining will be conducted by open pit methods,…

Read More

DRA Awarded Design of Pilgangoora Lithium Project by Altura Mining

Perth – 7th June, 2016 – DRA has been awarded the preliminary engineering and design of the processing facilities for the Pilgangoora Lithium Project, located in the Pilbara Region of Western Australia.   The project is being developed by Altura Mining of Perth and is recognised as an advanced-stage, near-term lithium project in Australia.  Mining…

Read More