Client: |
Simcoa Operations |
|
Location: |
Kemerton, Western Australia |
| Throughput: | 50,000 tpa |
|
Completion: |
2012 |
|
Scope: |
Feasibility Study |
|
Commodity: |
Silicon |
Provision of the EPCM services for the project which involved the installation of a third submerged arc furnace and associated infrastructure.
The engineering design was completed in 3-D, with a fully integrated “intelligent” 3-D model developed as part of the design process.
The Simcoa operation is unique in that it involves the only fully integrated silicon metal production plant in the world.